ABP Scaffolding
Formwork Tie Rod Nut is an essential accessory in concrete pouring projects, particularly for shear walls. Functioning as a critical part of the wall tie system, it works in conjunction with Tie Rods to fasten formwork panels securely during the concrete pouring process. These nuts are versatile and can be utilized in various fastening applications across construction sites.
Primarily used as a component in wall formwork for wall tie purposes, slab formwork, column formwork, climbing formwork, and various scaffolding systems.



Production Timeline: For full container orders, production typically requires 20-30 days following the receipt of the down payment.
Transport: Shipping duration depends entirely on the destination port and local logistics.