ABP Scaffolding ABP Scaffolding

Construction Scaffolding Wing Nut Anchor Nut Tie Rod Nut Plate Nut Tie Rod Combination Nut for Formwork System

Product Description

Formwork Tie Rod Nut is an essential accessory in concrete pouring projects. Together with the Tie Rod, they act as a robust wall tie system to fasten formwork panels tightly during concrete pouring.

This high-quality construction formwork fastener is widely utilized in major infrastructure projects including high-rise buildings, bridges, tunnels, and nuclear power projects.

✨ Key Features
High tensile strength material for maximum safety.
High processing precision with precise threading.
Superior surface treatment: Electroplated for corrosion resistance.
📋 Technical Specifications
Item Concrete Formwork Nut, Scaffolding Wing Nut, Anchor Nut, Tie Rod Nut
Material QT500-7
Dimensions 17x10mm
Weight 0.32KG
Surface Plating / Galvanized
Standard DIN 18216
MOQ 1000 pieces
Package Steel pallet, carton, plywood case, or customized request
Delivery Time 20-30 days
📷 Product Gallery
Formwork Tie Rod Nut Overview
Scaffolding Nut Details
Formwork System Accessory
Wing Nut Close up
Tie Rod Nut Plate
Combination Nut
Anchor Nut View
Construction Hardware
Formwork Nut Application
Steel Nut Component
Scaffolding Parts
Industrial Fastener
📜 Certifications
Quality Certifications
🏭 Industry Expertise

Our expertise lies in the manufacturing of ductile casting, hardware, and scaffolding parts. We specialize in providing high-precision metal products and construction system accessories for global infrastructure projects, adhering to international standards and quality controls.

Production Facility
❓ Frequently Asked Questions
What is your minimum order quantity (MOQ)?
The minimum order quantity is at least 1 ton or 1000 pieces depending on the specific item requirements.
What are your standard packing methods?
Products are usually packed into woven bags with steel pallets, or in cartons and plywood cases as per your specific requirement.
What are the available payment terms?
We typically accept a 30% advanced payment with the balance against a copy of the BL, or 100% L/C at sight. Other terms are negotiable based on order status.
What is the estimated delivery time for an order?
Standard delivery takes approximately 20 to 30 days after the receipt of the advance payment or L/C.
Are you a manufacturer or a trader?
We are a professional manufacturer of scaffolding and formwork systems with many years of production experience.
What materials are used for the Tie Rod Nuts?
The nuts are primarily manufactured using high-grade QT500-7 ductile iron to ensure high tensile strength and durability.

Related Products