ABP Scaffolding ABP Scaffolding

Forged Casted Tie Rod Formwork System Accessories Wing Nut

Still deciding? Get samples of $ !
Order Sample

Product Description

📋 Basic Information
Model NO.:m4-m36
Nut Height:Standard Height
Standard:ANSI, DIN, GB
Name:Wing Nut
Surface:HDG (Hot Dip Galvanized)
Raw Material:C45 Steel
Application:Building Scaffold Formwork
Package Size:200.00cm * 150.00cm * 80.00cm
⚙️ Product Description
Formwork Wing Nut 1
Formwork Wing Nut 2

Wing Nut Formwork is a type of fastening tool commonly used in construction and bridge projects, particularly in concrete formwork systems. It is typically used in conjunction with rods, nuts, and other fasteners to securely and quickly fix formwork during construction. Its simple design and ease of use make it an efficient solution for formwork installation and removal.

Product NameFormwork Wing Nut
Surface TreatmentHDG (Hot Dip Galvanized) or Zinc Plate
PackageSteel pallet, carton, plywood case, or as requested
Material FeaturesHigh tensile strength, precise thread
📐 Technical Specifications
Round Plate Formwork Wing Nut (2 Legs)
Size (mm) Thickness (mm) Diameter (mm) Weight (g) Legs
D125.51004002 legs
D166803702 legs
D1710803652 legs
D206804002 legs
D22101107802 legs
Round Plate Formwork Wing Nut (3 Legs)
Size (mm) Thickness (mm) Diameter (mm) Weight (g) Legs
D1661005303 legs
D1710904503 legs
D186.35904503 legs
D22101109503 legs
🌟 Key Features & Advantages
Winged Design

Features two or three wings for easy tightening and loosening by hand or tools, enhancing efficiency.

High-Strength Material

Made from carbon or alloy steel for maximum tensile strength and durability in harsh environments.

Quick Installation

Designed for fast deployment and removal, significantly reducing labor time on construction sites.

Corrosion Resistance

Surface treatments like HDG or Zinc plating ensure long-term performance against moisture and rust.

Wing Nut Advantage 1
Wing Nut Advantage 2
📸 Detailed Product Images
Detailed Image 1
Detailed Image 2
Detailed Image 3
Detailed Image 4
📦 Packaging & Quality

Our products are widely used in bridge engineering, tunnel construction, foundation pit engineering, and high-rise buildings. We utilize advanced production technology and strict quality control systems.

Certifications
Packaging
Frequently Asked Questions
Q: What is the primary application for these wing nuts?
A: These wing nuts are primarily used in high-rise building construction, bridge, tunnel, and nuclear power projects to securely fasten concrete formwork systems.
Q: Can I get samples before placing a bulk order?
A: Yes, we provide stock samples. While the samples are free, customers are typically responsible for the freight/shipping costs.
Q: What is the typical delivery time for orders?
A: For items in stock, delivery is usually 7-14 days. For custom production or non-stock items, it ranges from 25-45 days depending on the quantity.
Q: What is your Minimum Order Quantity (MOQ)?
A: We maintain a large inventory of standard sizes, so the MOQ can be as low as one unit for stock items.
Q: How is the quality of the products guaranteed?
A: We ensure quality through a pre-production sample before mass production and a final thorough inspection before every shipment.
Q: What surface treatments do you offer for wing nuts?
A: We primarily offer Hot Dip Galvanized (HDG) and Zinc Plating to ensure high corrosion resistance and long-term durability.

Related Products