ABP Scaffolding ABP Scaffolding

En74 BS1139 JIS British Drop Forged Hot Dipped Galvanized Scaffold Sleeve Double Swivel Board Retain Putlog Beam Tube Pipe Scaffold Fittings Clamp

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Info.

Model NO.Scaffold Coupler Scaffold Fittings
MaterialMetal (Q235)
Surface TreatmentElectric Galvanized/ Hot Galvanized
Delivery Time15-20 days
StandardBS1139/ EN74
MOQ500 PCS
OriginChina

Product Description

Scaffolding coupler is used to assemble tube-and-coupler scaffolding systems, providing an excellent solution for construction and maintenance works with economic convenience, safety, and high quality.

Scaffold Coupler

Company Profile

We are a professional company specializing in the manufacturing and distribution of steel and aluminium formwork and scaffolding. With over 18 years of experience in product design, engineering, and construction, we serve 41 countries globally, including markets in the USA, Europe, and Asia. Our products comply with international standards such as EN-1090, ISO14001, and OHSAS18001.

Detailed Pictures

Scaffolding Details
Scaffolding Details
Scaffolding Details

FAQ

What are the primary applications of these scaffold couplers?
These couplers are essential for assembling tube-and-coupler scaffolding systems used in building construction, maintenance, and industrial support structures.
What surface treatments are available?
We offer both Electric Galvanized and Hot Dipped Galvanized finishes to ensure durability and resistance to corrosion in various environmental conditions.
Do your products meet international quality standards?
Yes, our scaffolding products are manufactured in compliance with international standards, including BS1139 and EN74, and are verified by third-party testing organizations like SGS and TUV.
What is the minimum order quantity (MOQ)?
The standard minimum order quantity for our scaffold couplers is 500 pieces.
How are the products packaged for shipping?
Our standard packaging involves using woven bags and steel pallets/trestles to ensure safe transport and easy handling.
What is the estimated delivery timeframe?
Typically, delivery takes between 15 to 20 days depending on the order volume and shipping requirements.

Related Products