ABP Scaffolding ABP Scaffolding

British Type Drop Forged Double Scaffolding Coupler Swivel Scaffolding Clamp

Still deciding? Get samples of $ !
Order Sample

Product Description

  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • Exhibition & Customer
  • Our Project

Overview

Basic Info

Model NO. scaffolding clamp
Material Steel
Type Mobile
Structural Style Multi-Pole Scaffolding
Framework Combined Scaffolding
Supporting Mode Floor Type Scaffolding
Lapping Form Full Scaffolding
Erection Position External Scaffolding
Move Method Attached Lifting Scaffolding
Scaffolding Part Type Scaffolding Couplers
Construction Properties Building Scaffold
Steel Grade Q235
Surface Treatment Electric Galvanized / Hot Galvanized
MOQ 500PCS
Delivery Time 15-20 days
Transport Package by Steel Pallets
Specification 48.3/60/76mm
Origin China
HS Code 7308400000
Production Capacity 5000 ton/Month

Packaging & Delivery

Package Size 1000.00cm * 1000.00cm * 1000.00cm
Package Gross Weight 1000.000kg

Product Description

Scaffolding Clamp

Scaffolding coupler is used to assemble tube-and-coupler scaffolding system.
British Type Drop Forged Double Scaffolding Coupler Swivel Scaffolding Clamp.

Advantage:
  • The tube and coupler scaffolding system is the best solution for construction or maintenance works.
  • Economic convenience.
  • Safety and quality.
Product Specification Details
Product name scaffolding clamp/ scaffold coupler
Material Q235
Standard BS1139/ EN74
Surface treatment Electric galvanized and Hot galvanized
Types Drop forged and pressed
Packing 25pcs/Woven bags, 50bags/pallets or as customer required.
British Type Drop Forged Double Scaffolding Coupler Swivel Scaffolding Clamp Product Image 1
British Type Drop Forged Double Scaffolding Coupler Swivel Scaffolding Clamp Product Image 2

Detailed Photos

Detailed View 1
Detailed View 2
Detailed View 3
Detailed View 4
Detailed View 5

Packaging & Shipping

Packaging and Loading Processes

Company Profile

We are one of the leading suppliers of scaffolding system and formwork solutions. We have 20 years of experience in the scaffolding business and are one of the industry's leaders in innovation and production. Our plants for scaffold production meet the highest quality standards. The production capacity is 5000 tons per month.
Our factory is managed strictly in accordance with the 6S standard. We insist on the "first piece product approval system" and "zero defect quality management", the unqualified semi-finished product is forbidden to transfer to the next process. Because of strict quality control, we win the market and customers. Till now we have exported to more than 60 countries and regions.
Factory Production Line Floor
Factory Warehouse Inventory

Exhibition & Customer

Exhibition Presence and Client Relationships

Our Project

Scaffolding Application in Construction Site Projects

Frequently Asked Questions (FAQ)

1. What materials are used to manufacture these scaffolding clamps?

Our scaffolding clamps and couplers are manufactured using high-quality steel (Q235 steel grade) to ensure maximum strength, safety, durability, and robust performance in heavy-duty construction applications.

2. Which safety standards do your scaffolding couplers comply with?

Our scaffolding couplers are strictly designed and manufactured in compliance with international standard regulations, including British Standard BS1139 and European Standard EN74.

3. What surface treatments do you offer for rust and corrosion prevention?

To ensure optimal resistance against harsh weather conditions and prolonged usage, our scaffolding clamps are treated with Electric Galvanizing (Zinc Plating) or Hot Dip Galvanizing processes.

4. What is the difference between drop forged and pressed scaffolding clamps?

Drop forged clamps are crafted under extreme pressure and heat, offering superior strength, higher load ratings, and heavy-duty performance. Pressed clamps are formed from sheet metal, providing an exceptionally cost-effective solution for lighter building constructions.

5. What is the Minimum Order Quantity (MOQ) and estimated delivery time?

Our standard Minimum Order Quantity (MOQ) is 500 pieces. Once the order details and down payments are finalized, the average delivery time is typically 15 to 20 days.

6. How are the scaffolding clamps safely packed for international transit?

The scaffolding couplers are securely packaged with 25 pieces per woven bag, and 50 bags organized per robust steel pallet. Custom packaging can also be accommodated based on specific client shipping requirements.

Related Products