ABP Scaffolding
Item: Scaffolding coupler/clamp. Scaffolding coupler is used to assemble tube-and-coupler scaffolding systems. Special marking can be provided as per customer requirements.
| NAME | STANDARD | SIZE | WEIGHT / KG | MATERIAL | SURFACE TREATMENT |
|---|---|---|---|---|---|
| Double coupler | BS1139 | 48.3mm | 0.82 | Q235 | Electro-Galvanized |
| Swivel coupler | BS1139 | 48.3mm | 1.00 | Q235 | Electro-Galvanized |
| Half Coupler | BS1139 | 48.3mm | 0.45 | Q235 | Electro-Galvanized |
| Putlog coupler | BS1139 | 48.3mm | 0.58 | Q235 | Electro-Galvanized |
| Board retaining coupler | BS1139 | 48.3mm | 0.57 | Q235 | Electro-Galvanized |
| Sleeve coupler | BS1139 | 48.3mm | 1.00 | Q235 | Electro-Galvanized |
| Inner Joint Pin Coupler | BS1139 | 48.3mm | 0.60 | Q235 | Electro-Galvanized |
| Beam Coupler | BS1139 | 48.3mm | 1.00 | Q235 | Electro-Galvanized |
| Limpet Coupler | BS1139 | 48.3mm | 0.32 | Q235 | Electro-Galvanized |
| Ladder Coupler | BS1139 | 48.3mm | 0.45 | Q235 | Electro-Galvanized |
| NAME | STANDARD | SIZE | WEIGHT / KG | MATERIAL | SURFACE TREATMENT |
|---|---|---|---|---|---|
| Double Coupler | BS1139/EN74 | 48.3mm | 0.98 | Q235 | Electro-Gal. / HDG |
| Swivel Coupler | BS1139/EN74 | 48.3mm | 1.12 | Q235 | Electro-Gal. / HDG |
| Half Coupler | BS1139/EN74 | 48.3mm | 0.52 | Q235 | Electro-Gal. / HDG |
| Board Retaining Coupler | BS1139/EN74 | 48.3mm | 0.62 | Q235 | Electro-Gal. / HDG |
| Putlog Coupler | BS1139/EN74 | 48.3mm | 0.63 | Q235 | Electro-Gal. / HDG |
| Girder/Beam Coupler | BS1139/EN74 | 48.3mm | 1.50 | Q235 | Electro-Gal. / HDG |
| Sleeve Coupler | BS1139/EN74 | 48.3mm | 1.00 | Q235 | Electro-Gal. / HDG |
| Inner Joint Coupler | BS1139/EN74 | 48.3mm | 1.05 | Q235 | Electro-Gal. / HDG |
| NAME | STANDARD | SIZE | WEIGHT / KG | MATERIAL | SURFACE TREATMENT |
|---|---|---|---|---|---|
| Double Coupler | BS1139 | 48.3mm | 1.00 | Ductile iron | Painted |
| Swivel Coupler | BS1139 | 48.3mm | 1.00 | Ductile iron | Painted |
| Inner Joint Coupler | BS1139 | 48.3mm | 1.00 | Ductile iron | Painted |
Scaffolding couplers serve as structural connections widely utilized across construction, marine engineering, infrastructure projects, and building maintenance. They provide strong stability and maximum safety for high-altitude operational platforms.
All couplers are strictly packed in steel pallets or export-grade bags with heavy duty wooden crates to guarantee stability and prevent surface scratches or damage during shipping.
Explore our extensive list of metal formwork components, pipes, structural steel items, and supporting fittings for various engineering requirements.
Our company was founded in 2002, holding a registered capital of ten million RMB. Our base is located in a primary northern port city of China, covering an area of 27,000 square meters. We specialize in the design and manufacture of high-quality metal products, which have been widely recognized by domestic and global customers alike.
Our main products include steel props, scaffolding systems, steel planks, LVL planks, plywood, base jacks, scaffolding couplers, formwork accessories, galvanized pipes, H20 beams, ground screws, solar mounting structures, C/Z/H section steels, and other structural materials.
With professional management personnel and a highly qualified technical team, we focus strictly on the key goals of "innovation, quality, service, economy, and dedication." Quality control is considered our ultimate corporate vitality.
Our production cycles strictly adhere to ISO9001 Quality Management Standards and ISO14001 Environmental System Requirements, ensuring consistency, high physical durability, and standard weight specifications.
You can provide us with your structural drawings, and we will produce them according to your exact designs. Alternatively, we can design the layout and solutions for your structural project if you do not have a clear plan yet.
Both TT (Telegraphic Transfer) and L/C (Letter of Credit) are accepted. TT payment method is generally more appreciated as it speeds up processing.
Delivery time mostly depends on the overall order quantity. Typically, the production and delivery cycle will range between 15 to 30 days.
All metal components and scaffolding prop piles are manufactured using first-quality raw materials under strict ISO certification guidelines, including performance stress tests and weight evaluations.
Our scaffolding systems and coupler systems are built primarily from Q235 steel conical pipes with high-quality welded blades, suitable for a vast variety of complex geological locations.
Buyer sends an initial inquiry → Receive our official quotation → Order detail confirmation → Buyer arranges 30% deposit → Production starts instantly upon receipt of the deposit.