ABP Scaffolding
The cuplock scaffolding system is a proven and economical solution designed for fast erection and high efficiency in large-scale construction projects. With its simple cup-locking mechanism and robust steel structure, it provides stable performance and reliable load support in demanding site conditions.
Vertical component forming the main load-bearing structure.
Horizontal member locked into the cup joint for stability.
Enhances overall system rigidity and safety under load.
Reduces overall project cost by minimizing material complexity and labor requirements.
The cup-locking mechanism allows quick connection, improving on-site efficiency.
Strong steel structure ensures reliable support for heavy-duty applications.
Civil & Building Construction
Bridge & Infrastructure
Industrial & Plant Construction
Temporary Structures & Events
| Item | Specification |
|---|---|
| Material | Q345 / Q235 Steel |
| Tube Diameter | 48.3 mm |
| Surface Treatment | Hot-dip Galvanized |
| Standard Length | 0.5 m – 3.0 m |
| Ledger Length | 0.6 m – 3.0 m |
| System Type | Cuplock Modular System |
| Customization | Available upon request |



A 10,000 m² manufacturing facility equipped with advanced auto-welding and laser processing equipment ensures consistent quality. With a monthly output of up to 30 containers, we support large-scale projects with reliable lead times.